The Roadmap (POA&M)

Plan remediation as roadmap items grouped by quarter, linked to the risks, goals and controls they move, with cost, effort, the gaps still without a plan, and a check that every item names an owner, a date and its proof.

The Roadmap tab is the client's plan of action and milestones, in plain words: what gets done, by whom, by when, at what cost, and which risk or control it moves.

Roadmap items

Add item opens a new one. Each item gets a reference (RM-001) and these fields, saved with Save item:

FieldNotes
Title, DescriptionWhat will be done. Name the missing control in one sentence: "No MFA on the admin console", not "IAM hardening".
TypeQuick win, project, policy, training, tooling, process or vendor.
PriorityCritical, high, medium or low.
StatusPlanned, in progress, blocked, done or dropped.
OwnerOne named person. The field suggests the client's contacts and the staff on the client.
Start, Due, Completed onWhen. Keep the due date inside 30 days (see The plan check).
Cost estimate (in US dollars) and EffortEffort in hours, days, weeks or months.
Treats riskThe risk from the register it reduces.
Supports goalThe business goal it serves.
ControlsThe framework controls it moves. Use Find controls to search the client's adopted frameworks.
How it is verifiedThe evidence that will close the item, stated up front: a screenshot, a log query, a re-test result.
Compensating controlWhat reduces the risk today, while the gap is open.
Closed withThe evidence the item was closed with. Needed when you mark the item done.

The plan check

An open item is a plan, not a wish, when it says what, who, when and how it is verified. Bedrock GRC checks the last three on every open item:

PartPasses when
WhoThe owner is one of the client's contacts, or one of your staff on the client, by name (capitals don't matter). A team or a distribution list ("Security team", "IT") cannot be held to a date, so it does not pass.
WhenThe item has a due date that has not passed and is no more than 30 days away, or the risk it treats is accepted.
VerifyHow it is verified is filled in.

What is up to you: the title should name the missing control in one sentence.

Work that needs longer than 30 days is a risk acceptance, not a plan. Link the risk the item treats and have that risk accepted (see Strategy and Risk), or bring the date in. The item's page says which parts are missing and, for a date too far out, links to the risk to accept.

The check flags items; it never stops you saving one. Items planned from an issued assessment, imported from a spreadsheet or still being worked out save as before and show as Not a plan yet until they name an owner, a date and their proof. Marking an item done is the one step it enforces: say what evidence closed it in Closed with. Items that were already done save without it.

Done and dropped items are not checked.

Open roadmap items grouped by quarter for a sample client: items owned by "Security team", due more than 30 days out without an accepted risk, or with no owner or date each say "Not a plan yet" and what they need; items with a named owner, a near date and their proof show nothing extra

How the tab is laid out

Four tiles head the tab: Open items (with how many are not yet a plan), Overdue, Gaps without a plan and Planned spend (the sum of open items' estimates). Under them, chips pick one of four views, each with its count:

  • Open items, grouped by quarter, with anything past its due date grouped under Overdue first. Each group shows its item count and planned cost. An item that fails the plan check says what it needs under its title.
  • Not a plan yet: the open items that fail the plan check, grouped the same way.
  • Gaps without a plan: controls assessed as not implemented or partial that have no open roadmap item yet. Plan it on each one starts an item linked to that control.
  • Done and dropped items, kept for the record.

The client overview shows the next 90 days of roadmap work, the portfolio counts open and overdue items per client, and the board report shows the next six months. The overview and the board report also count the open items that are not yet a plan.

Where roadmap items come from

  • A control page: Plan remediation on a control assessed as not implemented or partial starts an item linked to that control.
  • Gaps without a plan on this tab (Plan it).
  • A finding in an issued assessment: Plan this on a finding a partner firm issued starts an item linked to that control. The form says "Planned from issued assessment vN", and the item keeps its link to that version. See Issuing an Assessment.
  • A readiness review: Add finding on a review starts an item tagged with the review and the domain it was found in. It shows on the roadmap as "Finding of RR-001 · D5". See Readiness Reviews.
  • A spreadsheet: an existing POA&M imports through the usual preview; roadmap rows can name a risk (R-012) and controls, for example CSF 2.0 PR.AA-01; CMMC L2 AC.L2-3.1.1. See Import and Export.

Items with a due date appear in Monitoring as they come due.

The roadmap and the formal plan document

For CMMC Level 2 clients, the roadmap is the working copy of the plan. The CMMC Level 2 additions starter set adds a "Plan of Action and Milestones" document to the library, so the client's formal, approved POA&M has its own versions and approvals. The eMASS export uses open roadmap items to fill in "Requirement in POA&M".