FRA filings & Form 5

The filing deadlines RailCompliant raises for you, how to close them out, and why Form 5 matters even in a year with no service.

Filing a record and reaching the deadline to send it to the FRA are two different obligations. When you complete a Part 230 inspection on a steam locomotive, RailCompliant opens the filing rows that inspection generates and puts a due date on each one.

Where filings appear

Outstanding filings show up in the FRA filings outstanding card on the Compliance Due page, below the next-due schedule. The card's badge shows either how many are open or how many are past deadline. Each row lists the locomotive, the filing, its citation, and the due date; overdue rows are highlighted and their date is shown in red. On a phone each row becomes a card. For a single locomotive, its Compliance tab links to its Form 5, and its audit binder shows whether the filing for each periodic inspection has been closed out.

The deadlines RailCompliant applies

FilingRaised byDue
FRA Form 1 (31/92-SD report)a 31-day or 92-day inspection10 days
FRA Form 3 (annual report)an annual inspection10 days
FRA Form 3a 1472-service-day inspection30 days
FRA Form 4 (boiler specification card)a 1472-service-day inspection30 days
FRA Form 19 (alteration/repair report)an alteration or welded/riveted repair30 days
Written notice of annual inspectiona projected annualat least one month ahead
FRA Form 5 (annual service-day report)the calendar year31 January

Days run from the inspection date. Each row carries a note reminding you what the filing needs — Forms 1, 3, 4, and 19 are dual-filed: at the place of maintenance and with the FRA Motive Power & Equipment Division Staff Director. The Form 19 note also records the § 230.20(c) distinction: reports on repairs to unstayed portions go to the FRA within 30 days, while stayed-portion repair reports are completed and retained for the life of the boiler but not sent in.

Filings are generated for steam locomotives; diesel and modern locomotives are tracked through Part 229 obligations on the compliance schedule instead.

No filings are raised where Part 230 does not apply: on a line set as insular (§230.2(b)(4)), on a line that runs freight trains only, inside an installation (§230.2(b)(2)), or on track under 24 inches (§230.2(b)(1)). You set both in Settings → Where your trains run. Filings that were already open are kept, not deleted, but they are not listed. If you change the answer back, they show again.

Form 5 — the one that bites

Form 5 is the annual service-day report, due for every steam locomotive between 31 December and 31 January under § 230.18(b). RailCompliant raises one per locomotive per year automatically. Its row has an Open Form 5 → button that renders the printable record: the running service-day counts since the last 31-day, 92-day, annual, and 1472 inspections, the inspections performed during the report year, the total service days for the year, and a signature block for the officer in charge.

A zero-service-day year still has to be filed. If Form 5 is not filed, the FRA may consider the locomotive retired under § 230.18(b)–(c) — and returning a retired locomotive to service requires completing every item of a full 1472 service-day inspection. The printed form says so on its face, and RailCompliant raises the filing whether or not the locomotive turned a wheel.

Service days are counted per § 230.8: any calendar day the boiler carries steam pressure above atmospheric with fire in the firebox — warm-up and cool-down days included.

Marking a filing as filed

Each row ends with a short form. Enter the date it was filed, choose where it went — FRA + local, FRA MP&E, or Local only — and click Mark filed. The filing drops off the outstanding list, and the action is written to the record history like any other change.

Closing a filing records what you did; it does not send anything. The printed and signed copy you mail or deliver is the filed record.

Last updated October 7, 2026