Words you will meet
Plain definitions of the RMF terms Bedrock SP uses: ATO, IATT, DATO, CCI, SCTM, POA&M, PPSM, ConMon, IAVM, CTO and the rest.
Every role guide explains a term the first time it needs it. This page collects them in one place.
Authorization
RMF (Risk Management Framework). The steps for managing the security risk of a system: prepare, categorize, select controls, implement, assess, authorize and monitor. Bedrock SP shows where each package is in these steps.
Authorization decision. The Authorizing Official's formal decision to let a system run. The four outcomes in Bedrock SP are:
- ATO (Authority to Operate): the system may run until its termination date.
- ATO with conditions: the system may run, and the AO lists conditions the program office must meet. Each condition becomes a recurring or dated duty.
- IATT (Interim Authority to Test): a short authorization to test the system.
- DATO (Denial of Authority to Operate): the system may not run.
Residual risk. The risk that remains after the controls are in place. The AO accepts it by signing the decision.
The system
Categorization. Deciding how much damage a loss of the system's confidentiality, integrity or availability (C/I/A) would cause: Low, Moderate or High. In Bedrock SP the program office picks the system's information types from NIST SP 800-60, and the levels follow.
Baseline. A starting list of security controls for an impact level, taken from NIST SP 800-53 Rev 5. An authorizing official can tailor a baseline and publish it as a numbered version.
Control. One security safeguard from NIST SP 800-53, such as AC-2 Account Management. CCI (Control Correlation Identifier) is DISA's finer unit: each control breaks into one or more CCIs, each a single testable statement.
SCTM (Security Control Traceability Matrix). The table of a system's controls and how each is implemented. In Bedrock SP it is the Implementation page of a package.
Inheritance. A system can inherit a control from a common control provider instead of implementing it. A control that is only partly covered by the provider is hybrid.
Boundary. What is inside the system for authorization purposes: its hardware, software and connections, with a description and diagrams.
PPSM (Ports, Protocols and Services Management). The register of the ports, protocols and services a system uses and which boundary they cross. Bedrock SP records the PPSM registration number. It does not check the number against DISA's list.
STIG (Security Technical Implementation Guide). DISA's configuration checklist for a product. A checklist (CKL) is a STIG with the results filled in.
Scans and vulnerabilities
ACAS / Nessus. The vulnerability scanners most DoD systems use. Bedrock SP reads Nessus files and STIG checklists. See Scans and tokens.
CAT I, II, III. The severity of a finding. CAT I is the most severe.
IAVM (Information Assurance Vulnerability Management). DISA's program of numbered notices (IAVA alerts, IAVB bulletins and IAVT technical advisories), each with a date by which systems must comply.
CTO (Cyber Tasking Order). An order from the authorizing level. In Bedrock SP a CTO is guidance with a number, required actions and a compliance date, and every package in its scope must comply with evidence the SCA validates.
Continuous monitoring
ConMon (continuous monitoring). The recurring duties that keep an authorization standing, such as reviewing logs every day. The AO lists the required ConMon items. The program office decides how it does them.
Obligation. One thing a program office owes with a due date: a ConMon item, an ATO condition, guidance to acknowledge, a CTO to comply with, or an assessment finding that needs a POA&M. The program office submits evidence and the SCA validates it.
POA&M (Plan of Action and Milestones). The plan to fix a weakness, with milestones and a scheduled completion date.
Standing. How a package measures up against the requirements that apply to it, right now. See Standing checks.
Exception. Relief from one standing check, requested by the program office and decided by the AO, with an end date.
Transfer. Moving a package to another program office, usually under another AO.